County Road Closings

A portion of County Road 601 in Orange Township will be closed  Monday, June 14th through Thursday, June 24th  for a culvert replacement.  The road will be closed between County Road 800 and Township Road 852.  It is anticipated that the road will reopened by the end of the day on Thursday, June 24th

A portion of County Road 175 in Mohican Township will be closed Monday, May 10th through Friday, September 3rd  for a Bridge Replacement.  The road will be closed between Township Road 1990 and County Road 1950.  It is anticipated that the road will reopen by the end of the day on Friday, September 3rd

 

For State Road Closings see Ohio Department of Transportation Traffic Roadway Information

 


 

County Road Work

Replace Structure 175-1960
Description:  Replace deficient bridge structure with structure meeting current standards.
Funding: 95% Federal-State Exchange capped at $965,390 / 5% Local match funds; 100% Local funds any over cap
Estimated construction timeframe: May 10 - Fall 2021
Work to be performed by V.O. Menuez & Son selected by competitive bid process.
--------------------
Slide Repair County Road 1027
Description:  Install soldier pilings and drainage tiles to stabilize the subgrade. Rebuild road base and pavement.
Funding: 84% LTIP funding capped at $5000,000 / 16% Local match funds; 100% Local funds any over cap
Estimated construction timeframe: Currently - Fall 2021
Work to be performed by Adena Corporation selected by competitive bid process.
--------------------
Guardrail – 2021
Description: Install new and upgrade existing guardrail to meet current standards on select sections of Ashland County-maintained roads.
Funding: 100% HSIP funds first $300,000; 100% Local funds any over $300,000
Estimated construction timeframe: Substantially completed (4/30/2021)
Work to be performed by Lake Erie Construction selected by competitive bid process.
--------------------
Pavement Marking – 2021
Description: Annual – Placement of pavement markings on all Ashland County-maintained roads.
Funding:  100% CSTP funds first $300,000; 100% Local funds any over $300,000
Estimated construction timeframe: Summer – Fall 2021
Work to be performed by J.D. Striping selected by competitive bid process.
--------------------
Replace Structure 775-2080
Description:  Replace deficient culvert structures with structure meeting current standards.
Funding: 100% Local funds
Estimated construction timeframe: Summer - Fall 2021
Work to be performed by Ashland County Highway workforce.
--------------------
Replace Structure 601-810
Description:  Replace deficient culvert structures with structure meeting current standards.
Funding: 100% Local funds
Estimated construction timeframe: Summer - Fall 2021
Work to be performed by Ashland County Highway workforce.
--------------------
Rehab Structure 281-110
Description:  Reinforce deficient structure to meet new load standards.
Funding: 100% Local funds
Estimated construction timeframe: Summer - Fall 2021
Work to be performed by Ashland County Highway workforce.
--------------------
Rehab Structure 3275-1050
Description:  Reinforce deficient structure to meet new load standards.
Funding: 100% Local funds
Estimated construction timeframe: Summer - Fall 2021
Work to be performed by Ashland County Highway workforce.
--------------------
Rehab Structure 1037-2570
Description:  Reinforce existing structure.
Funding: 100% Local funds
Estimated construction timeframe: Summer - Fall 2021
Work to be performed by Ashland County Highway workforce.
--------------------
Paving 2021
Description: 20 miles of various county roads will be resurfaced with Asphalt Concrete
Funding:  100% Local funds
Estimated construction timeframe: May 12 – Fall 2021
Work to be performed by Sarver Paving selected by competitive bid process.
--------------------
Sealing 2021
Description: 50 miles of various county roads will get protective sealing
Funding:  100% Local funds
Estimated construction timeframe: Summer – Fall 2021
Work to be performed by Melway Paving selected by competitive bid process.
--------------------
Guardrail – 2022
Description: Install new and upgrade existing guardrail to meet current standards on select sections of Ashland County-maintained roads.
Funding: 100% HSIP funds first $300,000; 100% Local funds any over $300,000
Estimated construction timeframe: Summer 2022
Work to be performed by a Contractor determined by competitive bid process.
--------------------
Pavement Marking – 2022
Description: Annual – Placement of pavement markings on all Ashland County-maintained roads.
Funding:  100% Local funds
Estimated construction timeframe: Summer – Fall 2022
Work to be performed by a Contractor determined by competitive bid process.
--------------------
Guardrail – 2023
Description: Install new and upgrade existing guardrail to meet current standards on select sections of Ashland County-maintained roads.
Funding: 100% HSIP funds first $300,000; 100% Local funds any over $300,000
Estimated construction timeframe: Summer 2023
Work to be performed by a Contractor determined by competitive bid process.
--------------------
Pavement Marking – 2023
Description: Annual – Placement of pavement markings on all Ashland County-maintained roads.
Funding:  100% Local funds
Estimated construction timeframe: Summer – Fall 2023
Work to be performed by a Contractor determined by competitive bid process.
--------------------
Guardrail – 2024
Description: Install new and upgrade existing guardrail to meet current standards on select sections of Ashland County-maintained roads.
Funding: 100% HSIP funds first $300,000; 100% Local funds any over $300,000
Estimated construction timeframe: Summer 2024
Work to be performed by a Contractor determined by competitive bid process.
--------------------
Pavement Marking – 2024
Description: Annual – Placement of pavement markings on all Ashland County-maintained roads.
Funding:  100% Local funds
Estimated construction timeframe: Summer – Fall 2024
Work to be performed by a Contractor determined by competitive bid process.
--------------------
Guardrail – 2025
Description: Install new and upgrade existing guardrail to meet current standards on select sections of Ashland County-maintained roads.
Funding: 100% HSIP funds first $300,000; 100% Local funds any over $300,000
Estimated construction timeframe: Summer 2025
Work to be performed by a Contractor determined by competitive bid process.
--------------------
Pavement Marking – 2025
Description: Annual – Placement of pavement markings on all Ashland County-maintained roads.
Funding:  100% Local funds
Estimated construction timeframe: Summer – Fall 2025
Work to be performed by a Contractor determined by competitive bid process.
 

Published on  June 11th, 2021